After the production order is created in the system, go to the Production Order page and locate the desired order in the PO table. Right-click the production order and select "Production Order Planning" from the context menu.
Select the production shifts that will be assigned to the production order. This step lets you optimize the use of available working hours and ensure a continuous production flow.
On the PO planning page, it's essential for users to set two key dates that serve as the time boundaries for order planning, particularly for medium and short term scheduling:
By setting these two dates, users can effectively manage and streamline the production workflow, ensuring that every phase of order planning is carried out within the defined timeframe, from initial fabric preparation to final delivery to the customer.
The system lets you estimate the hourly throughput, start date, or end date required to complete the production order. Enter any two of the three inputs (hourly throughput, start date, or end date), and the system will calculate the remaining input based on the available time and production requirements. The estimate takes the previously selected shifts into account.
Automated Date Change Tracking: The system automatically creates a chronological log entry whenever a change to the "Production Start Date" or "Production Delivery Date" is saved. This ensures that no change is lost, accurately documenting the timeline from the creation of the production order until its completion.
To effectively plan the production process, you can assign sections to stages. This allocation of resources lets you streamline the workflow and ensure efficient use of available resources. The order cannot start being worked on inside a section until it has been assigned to that section. Once assigned, line and section supervisors can see the order in the orders queue on their monitoring app, so they can start working on it on the production floor.
Select the machines you want to assign to each process within the production order. The required number of machines is calculated based on the section's efficiency and the production time. The system compares the required machines with the assigned machines and displays the difference. If the difference is positive, the order can be completed within the specified timeframe. If the difference is negative and shown in red, additional machines are needed to meet the deadline.

Reach out to the Garment IO team. We're here to make sure you're getting the most out of every feature.