Work hours are a defined working period within a 24-hour day, during which assigned employees carry out their duties. The system allows work hours to be customized to match the unique operational requirements of each factory.
1. Creating the Main Work Hours
The backbone of factory operations is the main work hours schedule. In most cases, it runs Saturday through Thursday, from 8 AM to 4 PM. The system also allows adding break periods, a key part of workforce management.
To add the main work hours:
"Cost rate" refers to the multiplier applied to an employee's standard rate during a given schedule. For example, if an employee's standard rate is 2 EGP per minute, and the shift's cost rate is set to 1, each minute worked during that shift costs 2 EGP. If the cost rate is raised to 1.5, the cost per minute rises to 3 EGP, as a result of multiplying the standard rate (2 EGP) by the cost rate (1.5).
3. Indefinite Work Hours Duration
For ongoing work hours with no predetermined end date, the "Indefinite" duration option keeps the schedule active without requiring frequent updates.
To set a schedule as indefinite:
4. Selecting Active Days
Customizing the active days for a work schedule lets you exclude non-working days, such as weekends or official holidays.
To select active days for a work schedule:
5. Creating Temporary Work Schedules
Special circumstances, such as Ramadan, where a shorter work schedule is needed, may require temporary adjustments to work hours. The system accommodates these changes efficiently by creating a new schedule on the Work Hours page.
To set up a temporary work schedule:
Note: Prioritizing work schedules is important in a factory with overlapping schedules that can run in parallel. The schedule order determines which one is selected first when its start time is reached in real time. For example, placing the Ramadan schedule at the top of the list means the system will automatically switch to it as the active schedule on the first day of Ramadan, even if the previous main schedule is still technically ongoing. Once Ramadan ends and its end date passes, the system reverts to the next schedule in priority order, restoring the previous main schedule as the active one.6. Line-Specific Work Hours
Larger factories may need to stagger break times across lines — for instance, one line taking a break at 12:30 PM and another at 1 PM — so the cafeteria doesn't get overcrowded at the same time.
To set up line-specific work hours:
7. Managing Overtime Work Schedules
The system provides the ability to efficiently manage overtime, including setting compensation rates that reflect the extra effort put in by the workforce.
To manage an overtime work schedule:
8. Adding Holidays
You can add holidays to exclude them from available work hours. Click the "Add Holiday" button at the bottom of the Work Hours page in the Holidays section, and enter the holiday name along with its start and end dates.
Note: The system marks the work schedules currently active in the factory with a ✅.Reach out to the Garment IO team. We're here to make sure you're getting the most out of every feature.